Hydrocarbon Processing Copying and distributing are prohibited without permission of the publisher

Reliability design concepts for the future clean fuels era

02.01.2002  |  Nelson, D. K.,  Conoco Inc., Ponca City, OklahomaVesier, C.,  RonaMax LLC, Bear, Delaware

The effects of storage capacity and interaction losses must be considered simultaneously with unit size

Keywords:

Reliability should be designed into every facility. Of course, this is equivalent to saying a parachute should be included in every jump from a plane. After all, who intentionally damages project economics by designing in unreliability? Despite this, many final designs have missed opportunities to substantially improve project economics through applying reliability design principles.

To continue reading please, log in to hydrocarbonprocessing.com.

Subscribe now for premium access and unlimited access to the site, including archived articles and the process handbooks.  Start a free trial to gain access to articles from the current issue of Hydrocarbon Processing. 


Already have an account?

Subscribe

Subscribe today and gain unlimited and immediate access to the site. Plus, you'll receive the next 12 issues of the magazine in your choice of print or digital format. Start your subscription today.

Free trial

Start a free trial and gain immediate access to the current issue of the magazine plus additional, select content.

30 Day Trial




Related articles

FEATURED EVENT


Sign-up for the Free Daily HP Enewsletter!

Boxscore Database

A searchable database of project activity in the global hydrocarbon processing industry

Poll

Should the US allow exports of crude oil? (At present, US companies can export refined products derived from crude but not the raw crude itself.)


64%

36%




View previous results

Popular Searches

Please read our Term and Conditions and Privacy Policy before using the site. All material subject to strictly enforced copyright laws.
© 2014 Hydrocarbon Processing. © 2014 Gulf Publishing Company.