Hydrocarbon Processing Copying and distributing are prohibited without permission of the publisher
Email a friend
  • Please enter a maximum of 5 recipients. Use ; to separate more than one email address.



South America

11.01.2011  |  Meche, Helen,  Hydrocarbon Processing Staff, Houston, TX

Keywords: [construction] [engineering] [ammonia] [utilities] [FEED]

Technip, within the framework of a cooperation partnership with Haldor Topsøe, was awarded a contract to provide basic- and front-end engineering services on a Petrobras grassroots fertilizer complex to be located at Uberaba, State of Minas Gerais, Brazil. The fertilizer complex will include a 1,500 metric tpd ammonia unit based on Haldor Topsøe technology, and the complete utilities and offsite systems necessary for operating the complex.

The basic-engineering design will be developed by Haldor Topsøe and Technip at Technip’s operating center in Rome, Italy, while the Technip operating center in Rio de Janeiro, Brazil, will execute the front-end engineering design (FEED).

Overall engineering activities are scheduled to be completed within the first half of 2012. The complex is scheduled to be in operation within the second semester of 2015.  HP



Have your say
  • All comments are subject to editorial review.
    All fields are compulsory.

Related articles

FEATURED EVENT

Boxscore Database

A searchable database of project activity in the global hydrocarbon processing industry

Poll

Should the US allow exports of crude oil? (At present, US companies can export refined products derived from crude but not the raw crude itself.)


83%

17%




View previous results

Popular Searches

Please read our Term and Conditions and Privacy Policy before using the site. All material subject to strictly enforced copyright laws.
© 2013 Hydrocarbon Processing. © 2013 Gulf Publishing Company.