Hydrocarbon Processing Copying and distributing are prohibited without permission of the publisher

CB&I wins work on BASF Belgium butadiene project

08.14.2012  | 

This award, valued in excess of $50 million, builds on CB&I’s existing relationship with BASF as licensor of its butadiene technology, according to the companies. The plant is scheduled to start up during 2014.

Keywords:

CB&I was awarded a contract from BASF for the engineering, procurement and construction management of a new butadiene extraction plant in Antwerp, Belgium.

The contract, which is valued in excess of $50 million, is an essential part of the total BASF investment amount, which will be in the high double-digit million euro range, the companies said.

The plant is scheduled to start up during 2014.

This award builds on CB&I’s existing relationship with BASF as licensor of its butadiene technology, according to company officials.

Butadiene is a raw material that can be used to produce synthetic rubber, among other applications including paper chemicals and plastics production.



Have your say
  • All comments are subject to editorial review.
    All fields are compulsory.

Related articles

FEATURED EVENT

Boxscore Database

A searchable database of project activity in the global hydrocarbon processing industry

Poll

Compared to the rest of the world, how long will the US hold its "ethane advantage" of cheap petrochemical feedstock?


30%

51%

19%




View previous results

Popular Searches


Please read our Term and Conditions and Privacy Policy before using the site. All material subject to strictly enforced copyright laws.
© 2011 Hydrocarbon Processing. © 2011 Gulf Publishing Company.