Prevent external corrosion of boiler tubes under refractory lining

09.01.2012  |  Maity, M. ,  SABIC Technology Centre, Jubail, Saudi ArabiaBiramov, K. ,  Sabic Technology Centre, Jubail, Kingdom of Saudi ArabiaAl-Zahrani, E. ,  Sabic Technology Centre, Jubail, Kingdom of Saudi ArabiaKareem, M. A.,  Eastern Petrochemical Co., Jubail, Kingdom of Saudi Arabia

Keywords: [boiler] [heat transfer] [tubes] [refractory] [insulation] [corrosion]

A leak developed on the water wall for several boiler tubes within five months of the commissioning of a plant boiler. In this case, the boiler tubes were partially covered with a castable refractory layer near the water drum at the bottom and at the top of the steam drum. Severe corrosion was noticed on the external surface of the boiler tubes, particularly at the lower section near the water drum. A detailed analysis and microstructural characterization of the corroded tubes and refractory samples were conducted to understand the root cause for the corrosion. Caustic gouging was determined as the predominate cause for the corrosion of the boiler tubes’ external surface. A review of the plant’s history noted that the boiler had been idled for a long time before commissioning. Wet refractory had promoted migration of alkalis to the tube surfaces, thus subsequently initiating the corrosion process.

To continue reading please, log in to hydrocarbonprocessing.com.

Subscribe now for premium access and unlimited access to the site, including archived articles and the process handbooks.  Start a free trial to gain access to articles from the current issue of Hydrocarbon Processing. 


Already have an account?

Subscribe

Subscribe today and gain unlimited and immediate access to the site. Plus, you'll receive the next 12 issues of the magazine in your choice of print or digital format. Start your subscription today.

Free trial

Start a free trial and gain immediate access to the current issue of the magazine plus additional, select content.

30 Day Trial




Related articles

FEATURED EVENTS





Sign-up for the Free Daily HP Enewsletter!

Boxscore Database

A searchable database of project activity in the global hydrocarbon processing industry

Poll

As low oil prices make naphtha cracking margins in Europe and Asia more competitive, are investments in new, ethane-based petrochemicals capacity in the US and Middle East becoming less attractive?


16%

65%

19%




View previous results

Popular Searches

Please read our Term and Conditions and Privacy Policy before using the site. All material subject to strictly enforced copyright laws.
© 2015 Hydrocarbon Processing. © 2015 Gulf Publishing Company.