Hydrocarbon Processing Copying and distributing are prohibited without permission of the publisher
Email a friend
  • Please enter a maximum of 5 recipients. Use ; to separate more than one email address.



KBR wins project management work for Azerbaijan gas processing plant

03.08.2013  | 

The new SOCAR gas processing plant will be located within the new oil-gas processing and petrochemical complex (OGPC) in Azerbaijan. The gas processing plant FEED completion is expected in October 2013, with the overall complex expected to start up operations in late 2020.

Keywords:

KBR was awarded a contract by the State Oil Company of the Azerbaijan Republic (SOCAR) to provide project management services for the FEED phase of a new gas processing plant, the company confirmed on Friday.

The gas processing plant will be located within the new oil-gas processing and petrochemical complex (OGPC) in Azerbaijan.

This award marks the first direct engagement between SOCAR and KBR on a large world-scale capital project, according to company officials. KBR said it will build upon its long-term project experience in Azerbaijan to perform services for project management and work with its established offices in Baku to provide support for the broader OGPC project.

The gas processing plant FEED phase of work will be supported from KBR’s global engineering centers located in London. 

“KBR is proud to support SOCAR on their flagship onshore OGPC world-scale facility,” said David Zelinski, president of KBR's downstream business. “This award confirms KBR’s presence as one of the top engineering contractors in the region, specifically Azerbaijan.” 

The gas processing plant FEED completion is expected in October 2013, with the overall complex expected to begin operating in late 2020.

The complex will consist of the gas processing plant, currently in FEED phase, with throughput capacity of 10-12 billion cubic meters/year, as well as a refinery with a capacity of 10 million tpy.

Oil products are being developed as strategic domestic assets and the petrochemical plant is being developed mostly for the export market, according to KBR officials.



Have your say
  • All comments are subject to editorial review.
    All fields are compulsory.

Nedim Demir
10.28.2013

Dear Sir Or Madam,

With 23 years work experience in various companies in my study, please publish a summary In sumaary water.

20 years, Carbide Hashim/Abdullah Hashim Gases (CHİNCO) Union Carbide Corp. for Industrial Gases Medical and other, especially in the Oil and Gas Companies for ARAMCO Saudi Arabia and UAE Gas filling of teaching adn education facilities Supervisor refined.

2 years Technical project construction Company TEKFEN, River branches and Bingazi in Libya Supervisor.

CAPRICORN Maritime port sea port customs follow-corporation ship operations and establishments that supply and Turkey for 2 years I worked intermittently.

Company have the to any place of business operates in both Worlds I am ready to work in other Countries of the Company employees.

Best Regards,
Nedim Demir

Mohammad Mahdi Rahimi
03.11.2013

i am expert of pmo.

Related articles

FEATURED EVENT

GasPro North America

Sign-up for the Free Daily HP Enewsletter!

Boxscore Database

A searchable database of project activity in the global hydrocarbon processing industry

Poll

Should the US allow exports of crude oil? (At present, US companies can export refined products derived from crude but not the raw crude itself.)


67%

33%




View previous results

Popular Searches

Please read our Term and Conditions and Privacy Policy before using the site. All material subject to strictly enforced copyright laws.
© 2014 Hydrocarbon Processing. © 2014 Gulf Publishing Company.