Hydrocarbon Processing Copying and distributing are prohibited without permission of the publisher

HPI Focus: New vs. debottlenecking projects

04.01.2013  |  Turner, J.,  Fluor, Sugar Land, TexasLuck, G.,  SNC-Lavalin, Hydrocarbons & Chemicals, Calgary, Alberta, CanadaVan Sickels, M. J.,  MVS Consulting LLC, Houston, Texas

As most owners do not have adequately skilled engineering teams to study these scenarios, engaging an experienced, qualified engineering contractor to support the conceptual study is often warranted.

Keywords: [construction] [project management] [revamps] [capital project]

James Turner is an executive process director in Fluor’s Sugar Land, Texas office. He manages the Houston Process Technology and Engineering Group, which has over 250 process engineers working on projects for Fluor clients. Mr. Turner has more than 25 years of experience in process design for a wide range of projects in the refining and gas processing industries, in domestic and international locations. He has published numerous technical articles about process design and project execution, and he holds patents for a combined hydrotreater process design. In 2006, he was a panelist at the NPRA Q&A and Technology Forum. Active in several professional organizations, he is the Past Chair of the South Texas Section of the American Institute of Chemical Engineers (AIChE). Mr. Turner is also on the AIChE Board of Trustees, and he has held several offices with AIChE in the past, including member of the Executive Board Programming Committee, and several positions with the Fuels and Petrochemicals Division, including Chair of the Division. In 2012, he received the Fuels and Petrochemicals Service Award for distinguished service to the division and industry. Mr. Turner is a graduate of Texas A&M University with a BS degree in chemical engineering. In 2011, he was inducted into the Texas A&M Chemical Engineering Academy of Distinguished Alumni.

James Turner

Exective Process Director,
Fluor Corp.,
Sugar Land, Texas



Owners of hydrocarbon processing (HP) facilities frequently analyze their markets and unit operations to determine if adding new units and/or debottlenecking existing units are economically attractive. The choice between building a new unit or revamping an existing unit for higher capacity can be influenced by many factors. HP owners have several options.

To continue reading please, log in to hydrocarbonprocessing.com.

Subscribe now for premium access and unlimited access to the site, including archived articles and the process handbooks.  Start a free trial to gain access to articles from the current issue of Hydrocarbon Processing. 


Already have an account?

Subscribe

Subscribe today and gain unlimited and immediate access to the site. Plus, you'll receive the next 12 issues of the magazine in your choice of print or digital format. Start your subscription today.

Free trial

Start a free trial and gain immediate access to the current issue of the magazine plus additional, select content.

30 Day Trial




Marie Luck
04.13.2013

Way to go Gary!

EUCLIDES PRIETO NAVARRO
04.09.2013

Excelllent article!!!

Related articles

FEATURED EVENT

GasPro North America

Sign-up for the Free Daily HP Enewsletter!

Boxscore Database

A searchable database of project activity in the global hydrocarbon processing industry

Poll

Should the US allow exports of crude oil? (At present, US companies can export refined products derived from crude but not the raw crude itself.)


68%

32%




View previous results

Popular Searches

Please read our Term and Conditions and Privacy Policy before using the site. All material subject to strictly enforced copyright laws.
© 2014 Hydrocarbon Processing. © 2014 Gulf Publishing Company.