Hydrocarbon Processing Copying and distributing are prohibited without permission of the publisher
Email a friend
  • Please enter a maximum of 5 recipients. Use ; to separate more than one email address.



Shell floats hull for massive Prelude FLNG facility

12.03.2013  | 

Once complete, Prelude FLNG will be the largest floating facility ever built. It will unlock new energy resources offshore and produce approximately 3.6 million tpy of LNG to meet growing demand.

Keywords:

The 488-meter-long hull of Shell’s Prelude floating liquefied natural gas (FLNG) plant has been floated out of the dry dock at the Samsung Heavy Industries (SHI) yard in Geoje, South Korea, where it is currently under construction, the company said on Tuesday.

Once complete, Prelude FLNG will be the largest floating facility ever built. It will unlock new energy resources offshore and produce approximately 3.6 million tpy of LNG to meet growing demand, according to the company.

“Making FLNG a reality is no simple feat," said Matthias Bichsel, director of projects and technology for Shell. "A project of this complexity -- oth in size and ingenuity -- harnesses the best of engineering, design, manufacturing and supply chain expertise from around the world."

"Getting to this stage of construction, given we only cut the first steel a year ago, is down to the expert team we have ensuring that the project’s critical dimensions of safety, quality, cost and schedule are delivered," he added.

FLNG will allow Shell to produce natural gas at sea, turn it into liquefied natural gas and then transfer it directly to the ships that will transport it to customers. It will enable the development of gas resources ranging from clusters of smaller more remote fields to potentially larger fields via multiple facilities where, for a range of reasons, an onshore development is not viable. 

This can mean faster, cheaper, more flexible development and deployment strategies for resources that were previously uneconomic, or constrained by technical or other risks, according to the company.

Prelude FLNG is the first deployment of Shell’s FLNG technology and will operate in a remote basin around 475 kilometers north-east of Broome, Western Australia, for around 25 years. The facility will remain onsite during all weather events, the company says, having been designed to withstand a category 5 cyclone.  

Shell is the operator of Prelude FLNG in joint venture with INPEX (17.5%), KOGAS (10%) and OPIC (5%). It is also working with long-term strategic partners Technip and Samsung Heavy Industries (the Technip Samsung Consortium). 



Have your say
  • All comments are subject to editorial review.
    All fields are compulsory.

Ms Haijar Sahid
01.27.2014

Dear Sir,
I am Haijar from Centre for Management Technology – a global conference organizer operating from Singapore. I am writing in with the keen intention to invite HYDROCARBON PROCESSING to collaborate with us as our Media Partner (non-monetary) for our FLNG World 2014 29-30 April 2014 in Kuala Lumpur, Malaysia http://www.cmtevents.com/aboutevent.aspx?ev=140414
I hope that we can discuss further on the possibilities of such collaboration.
Thank you & best regards
Haijar

Related articles

FEATURED EVENT



Sign-up for the Free Daily HP Enewsletter!

Boxscore Database

A searchable database of project activity in the global hydrocarbon processing industry

Poll

Should the US allow exports of crude oil? (At present, US companies can export refined products derived from crude but not the raw crude itself.)


70%

30%




View previous results

Popular Searches

Please read our Term and Conditions and Privacy Policy before using the site. All material subject to strictly enforced copyright laws.
© 2014 Hydrocarbon Processing. © 2014 Gulf Publishing Company.