Hydrocarbon Processing Copying and distributing are prohibited without permission of the publisher

Better strategies avoid project delays—Part 1

04.01.2014  |  Corrales-Pérez, J.,  Tecnicas Reunidas , Madrid, Spain

Keywords: [project management] [EPC] [overrun] [FEED] [detail engineering]

Even when using 3D CAD, advanced project management systems and fast-track concepts, projects now take longer than they did two decades ago. Schedule overruns occur as frequently, despite the application of advanced management systems. The automobile industry and other engineering and fabrication sectors have achieved dramatic improvements in productivity and delivery time; yet, the downstream industry still struggles to effectively oversee engineering, procurement and construction (EPC) projects and adhere to budgets and construction timelines.

To continue reading please, log in to hydrocarbonprocessing.com.

Subscribe now for premium access and unlimited access to the site, including archived articles and the process handbooks.  Start a free trial to gain access to articles from the current issue of Hydrocarbon Processing. 


Already have an account?

Subscribe

Subscribe today and gain unlimited and immediate access to the site. Plus, you'll receive the next 12 issues of the magazine in your choice of print or digital format. Start your subscription today.

Free trial

Start a free trial and gain immediate access to the current issue of the magazine plus additional, select content.

30 Day Trial




Related articles

FEATURED EVENT


Sign-up for the Free Daily HP Enewsletter!

Boxscore Database

A searchable database of project activity in the global hydrocarbon processing industry

Poll

On average, what range will Brent and WTI crude oil prices trade in during 2016?


50%

45%

3%

2%




View previous results

Popular Searches

Please read our Term and Conditions and Privacy Policy before using the site. All material subject to strictly enforced copyright laws.
© 2015 Hydrocarbon Processing. © 2015 Gulf Publishing Company.