Results 1-6 of 6 for Article Date:01-22-2013. (0.017799 seconds)
relevance / newest first / oldest first
Phase 1A of the Southern California company's pipeline safety enhancement program consists of pressure testing 360 miles of existing pipelines; replacing ... View this article
The approval by the state's governor, a Republican, is one of the last remaining hurdles the pipeline has to clear before getting a final permit from the ... View this article
The process of restarting the unit began late last year, but was further delayed by the discovery of new pipe leaks and a small fire. A person familiar with ... View this article
The scope of CB&I's current project includes a crude oil stabilization unit, gas processing units and LPG storage and transfer facilities. The operation ... View this article
Total US production of liquid fuels could equal or surpass Saudi Arabia as early as next year, but crude oil output will still remain short, according to an ... View this article
The full integration of the new INA plant into the existing petrochemical site of MPCC in Maoming will allow for a comprehensive system for managing ... View this article
A searchable database of project activity in the global hydrocarbon processing industry
Engineers and designers are highly skilled individuals. Forcing them to enter design changes using tables, forms and spreadsheets is unproductive and uneconomical, and it increases the likelihood of human error—this is the way that most instrumentation software systems currently work. For too long, software vendors have denied engineers and designers the simple practicality of a graphical visual engineering interface with “drag and drop” capability and inbuilt intelligence, ensuring changes are automatically replicated into all the associated data and databases.
D. GIBSON, AVEVA
Compared to the rest of the world, how long will the US hold its "ethane advantage" of cheap petrochemical feedstock?
Up to 5 years 29%
Up to 10 years 52%
Longer 18%