Results 1-5 of 5 for Article Date:01-23-2012. (0.017621 seconds)
relevance / newest first / oldest first
Australia Pacific LNG and Sinopec amended their existing LNG sales agreement for the supply of an additional 3.3 million tpy of LNG through to ... View this article
Toyo Engineering Corp. has been awarded a contract for a caprolactam plant for DSM Nanjing Chemical (DNCC), a joint venture company between ... View this article
Oil and gas industry leaders have forecast improved performance and higher levels of capital expenditure in 2012 despite concerns over global economic ... View this article
The 27-nation European Union agreed on Monday to block all crude-oil imports from Iran, as it steps up pressure on the Gulf nation to scale back its ... View this article
BY ISABEL ORDONEZ. TAKING THE PULSE: The top three US oil companies are expected to post higher earnings for ... View this article
A searchable database of project activity in the global hydrocarbon processing industry
Engineers and designers are highly skilled individuals. Forcing them to enter design changes using tables, forms and spreadsheets is unproductive and uneconomical, and it increases the likelihood of human error—this is the way that most instrumentation software systems currently work. For too long, software vendors have denied engineers and designers the simple practicality of a graphical visual engineering interface with “drag and drop” capability and inbuilt intelligence, ensuring changes are automatically replicated into all the associated data and databases.
D. GIBSON, AVEVA
Compared to the rest of the world, how long will the US hold its "ethane advantage" of cheap petrochemical feedstock?
Up to 5 years 28%
Up to 10 years 53%
Longer 19%