Results 1-4 of 4 for Article Date:01-24-2013. (0.016796 seconds)
relevance / newest first / oldest first
The contract covers the basic engineering, front-end engineering design, detailed engineering and procurement services for the ISBL (inside battery ... View this article
Commencement of natural gas deliveries will coincide with the startup of the plant, which is expected by the end of 2014. This contract will enhance ... View this article
The plants are expected to produce up to 250000 tons of hydrogen peroxide, 220000 tons of isononanol and 110000 tons of 1-butene annually, according ... View this article
Preliminary data show the volume of LNG changing hands declined for the first time in the industry's history by 2.5 million metric tons in 2012, compared ... View this article
A searchable database of project activity in the global hydrocarbon processing industry
Engineers and designers are highly skilled individuals. Forcing them to enter design changes using tables, forms and spreadsheets is unproductive and uneconomical, and it increases the likelihood of human error—this is the way that most instrumentation software systems currently work. For too long, software vendors have denied engineers and designers the simple practicality of a graphical visual engineering interface with “drag and drop” capability and inbuilt intelligence, ensuring changes are automatically replicated into all the associated data and databases.
D. GIBSON, AVEVA
Compared to the rest of the world, how long will the US hold its "ethane advantage" of cheap petrochemical feedstock?
Up to 5 years 28%
Up to 10 years 53%
Longer 19%