Results 1-4 of 4 for Article Date:02-08-2013. (0.018279 seconds)
relevance / newest first / oldest first
The plant will be designed using KBR's Purifier technology, which has demonstrated higher reliability than conventional designs and offers the lowest ... View this article
TPC Group first entered the market in May 2000 with the startup of its patented PIB process. Since that time, the company has grown significantly through ... View this article
The facility will process 20000 bpd of Bakken crude oil. Construction could begin this spring, and is expected to take up to 20 months. The plant will be ... View this article
The plant, which will be commissioned in the first half of 2015, will double Air Liquide's carbon monoxide production capacity in the basin. The company ... View this article
A searchable database of project activity in the global hydrocarbon processing industry
Engineers and designers are highly skilled individuals. Forcing them to enter design changes using tables, forms and spreadsheets is unproductive and uneconomical, and it increases the likelihood of human error—this is the way that most instrumentation software systems currently work. For too long, software vendors have denied engineers and designers the simple practicality of a graphical visual engineering interface with “drag and drop” capability and inbuilt intelligence, ensuring changes are automatically replicated into all the associated data and databases.
D. GIBSON, AVEVA
Compared to the rest of the world, how long will the US hold its "ethane advantage" of cheap petrochemical feedstock?
Up to 5 years 29%
Up to 10 years 52%
Longer 19%