Results 1-5 of 5 for Article Date:02-25-2013. (0.015820 seconds)
relevance / newest first / oldest first
This approval follows the successful completion of the project's preliminary engineering study to produce butadiene from a variety of sources. TPC Group ... View this article
Construction of the liquefied natural gas complex is expected to begin later this year. The local government of Fujairah, one of the seven emirates that ... View this article
The deal for up to 60% of Beach's interests in two blocks in central Australia's Cooper Basin cements Chevron's status as one of the biggest investors ... View this article
Information about close calls on other rigs wasn't passed along, a lawyer said, adding that just a month before the April 2010 accident, the Transocean ... View this article
China's Ministry of Environmental Protection said its pilot insurance plan is now mandatory for mining and smelting producers, lead-acid battery ... View this article
A searchable database of project activity in the global hydrocarbon processing industry
Engineers and designers are highly skilled individuals. Forcing them to enter design changes using tables, forms and spreadsheets is unproductive and uneconomical, and it increases the likelihood of human error—this is the way that most instrumentation software systems currently work. For too long, software vendors have denied engineers and designers the simple practicality of a graphical visual engineering interface with “drag and drop” capability and inbuilt intelligence, ensuring changes are automatically replicated into all the associated data and databases.
D. GIBSON, AVEVA
Compared to the rest of the world, how long will the US hold its "ethane advantage" of cheap petrochemical feedstock?
Up to 5 years 29%
Up to 10 years 52%
Longer 19%