Results 1-7 of 7 for Article Date:06-18-2012. (0.017257 seconds)
relevance / newest first / oldest first
Jacobs was awarded an engineering, procurement and construction management contract for three PE trains for Sadara, the joint venture between ... View this article
Petroplex International, a development company of bulk liquids storage tank terminals, has launched the front-end engineering and design (FEED) study ... View this article
The state-run gas developer and supplier, known as Kogas,. View this article
Plastics compounder A Schulman says it recently opened global innovation centers in Kerpen, Germany (near Cologne), and in San Luis Potosi, Mexico ... View this article
The Crossroads gas processing system, located in Harrison county in East Texas, includes 8 miles of gas gathering pipe, an 80 million cubic feet per ... View this article
The Packinox heat exchangers will be used in catalytic processing sections in the production of mixed Xylenes used for synthetic nylons and PET bottles ... View this article
There is no credible bid to run the Coryton site as a refinery, a local union says, and initial job cuts are planned for late next week. The complex may ... View this article
A searchable database of project activity in the global hydrocarbon processing industry
Engineers and designers are highly skilled individuals. Forcing them to enter design changes using tables, forms and spreadsheets is unproductive and uneconomical, and it increases the likelihood of human error—this is the way that most instrumentation software systems currently work. For too long, software vendors have denied engineers and designers the simple practicality of a graphical visual engineering interface with “drag and drop” capability and inbuilt intelligence, ensuring changes are automatically replicated into all the associated data and databases.
D. GIBSON, AVEVA
Compared to the rest of the world, how long will the US hold its "ethane advantage" of cheap petrochemical feedstock?
Up to 5 years 29%
Up to 10 years 52%
Longer 19%