Results 1-4 of 4 for Article Date:11-06-2012. (0.015905 seconds)
relevance / newest first / oldest first
The $2.2 billion, four-year Detroit Heavy Oil Upgrade Project increased the refinery's heavy-oil processing capacity to 100000 bpd, five times the amount ... View this article
Workers at the site shut down the unit shortly after a small explosion caused a fire at the plant, Ivan Freites, secretary general of the local oil workers union ... View this article
Construction of the new 40000 square meter facility – BASF's largest in Europe – will begin before the end of 2012. The plant will start production in the ... View this article
The World Bank has launched an analytical and advisory assistance program in China in order to build the country's understanding of, and capacity ... View this article
A searchable database of project activity in the global hydrocarbon processing industry
Engineers and designers are highly skilled individuals. Forcing them to enter design changes using tables, forms and spreadsheets is unproductive and uneconomical, and it increases the likelihood of human error—this is the way that most instrumentation software systems currently work. For too long, software vendors have denied engineers and designers the simple practicality of a graphical visual engineering interface with “drag and drop” capability and inbuilt intelligence, ensuring changes are automatically replicated into all the associated data and databases.
D. GIBSON, AVEVA
Compared to the rest of the world, how long will the US hold its "ethane advantage" of cheap petrochemical feedstock?
Up to 5 years 28%
Up to 10 years 53%
Longer 19%