%@ LANGUAGE=VBScript %> <% Option Explicit %> <% bConfidential = True iPublication = 24 %>
| cumulative index: 1994 present |
|
Author: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q-R | S | T | U-V | W | X-Y-Z Subject: A | B | C | D | E | F | G | H I | K | L | M | N | O | P | R | S | T | U | V | W |
| E | Date | |||
| Early, II, W. F. | ||||
| Improve client-contractor working relationships under PSM | Oct-96 | |||
| Early, Jr., P.L. | ||||
| Integrated terminal operations improves profitability | May-97 | |||
| Eastman, Alan D. | ||||
| Consider online monitoring of HF acid when optimizing alkylation operations | Aug-01 | |||
| Eastman, M.M.R. | ||||
| Computer delivery of operating and maintenance procedures | May-96 | |||
| Eastwood, Alan | ||||
| ACHEMA 2006 and beyond: United Kingdom | May-06 | |||
| Ebeling, H. O. | ||||
| Reduce emissions from dehydration units | Apr-99 | |||
| Eberhardt, Juergen | ||||
| How to efficiently plan a grassroots refinery | Jun-01 | |||
| Ebi, G. | ||||
| Operating deflection shape analysis - a powerful tool to increase plant reliability | Oct-01 | |||
| Ebin, Lois A. | ||||
| What to look for in a project feasibility study Part 2 | Sep-04 | |||
| What to look for in a project feasibility study Part 1 | Aug-04 | |||
| Eckhardt, Linda L. | ||||
| Flow-induced noise and vibration in turbocompressors and piping systems | Oct-00 | |||
| Economides, Michael J. | ||||
| Natural gas and LNG trade a global perspective | Jul-06 | |||
| Edmonds, C. | ||||
| Make boiler feedwater with lower risks | Aug-97 | |||
| Edmunds, K. | ||||
| Lessons learned during revamp of 34 year-old reformer | Dec-07 | |||
| Edwards, L.A. | ||||
| Computerization: problems and solutions | Jun-94 | |||
| Efrenmushkin, N.F. | ||||
| U.S.-Russia cooperation in E/C: recent lessons | Dec-95 | |||
| Ego, Dave | ||||
| Improve your facility's PHA methodology | Apr-04 | |||
| Eguren, Ralph | ||||
| Are you handling sulfur safely? | Jul-03 | |||
| Ehrich, R. | ||||
| Reduce residual pulsation in reciprocating compressors | Jul-95 | |||
| Ekholm, E.L. | ||||
| Networking is cheap job insurance | Dec-94 | |||
| El Sherif, A.H. | ||||
| Analyze bearing problems by ball path inspection | Apr-94 | |||
| Elbert, Gary W. | ||||
| Centralized control room operates five process units | Apr-02 | |||
| El-Halwagi, M. | ||||
| Optimize heat transfer networks | Mar-08 | |||
| Integrated techniques for low-cost process debottlenecking | Sep-07 | |||
| |
||||
| Ellington, R.T. | ||||
| Corporate opportunities for chemical engineers | Aug-95 | |||
| Elliott, B. | ||||
| Using DIERS two-phase equations to estimate tube rupture flowrates | Aug-01 | |||
| Do we need relief valves on FCC main fractionators? | Oct-01 | |||
| Elliott, George | ||||
| Unintended consequences: the costs of complexity | Aug-02 | |||
| Elliott, Hurlel G. | ||||
| Understanding kinetic requirements of induction motors | May-00 | |||
| Elliott, John D. | ||||
| Upgrade refinery residuals into value-added products | Jun-06 | |||
| Fine-tune your delayed coker: obstacles and objectives | Sep-04 | |||
| Optimize coker operations | Sep-03 | |||
| Elliott, Stephen | ||||
| ACHEMA 2003 Perspective: United Kingdom | May-03 | |||
| Elmaleh, A. | ||||
| Industrial property: a valuable weapon | Jan-97 | |||
| Emerson, G. | ||||
| Improve safety with pilot operated relief valves | Oct-96 | |||
| Emerson, G. B. | ||||
| Reduce process emissions and releases from PRVs | Sep-01 | |||
| Eng, Curtis N. | ||||
| Consider new catalytic routes for olefins production | Apr-08 | |||
| Entwistle, Mike | ||||
| Project alliance delivers 'green' fuels | Feb-01 | |||
| Ercole, S.D. | ||||
| Flexible-element couplings: How safe is safe? | Dec-94 | |||
| Erickson, G.P. | ||||
| Bioventing reduces soil cleanup costs | Aug-95 | |||
| Ernest, J. B. | ||||
| Use dynamic simulation to model HPU reactor depressuring | Jan-95 | |||
| Ernst, Peter | ||||
| Labyrinth compressors improve reliability in low-temperature service | May-06 | |||
| Ernst, Werner S. | ||||
| Push syngas production limits | Mar-00 | |||
| Eryurek, Evren | ||||
| Abnormal situation prevention through smart field devices | Mar-06 | |||
| Diagnostics capabilities of Foundation fieldbus pressure transmitters | Apr-03 | |||
| Eskaros, Michael G. | ||||
| E85—it's a whole new ballgame | Feb-08 | |||
| Fine-tune your listening skills | Nov-04 | |||
| Avoid retrofit pitfalls through improved FEED | Feb-04 | |||
| Glycol dehydration | Jul-03 | |||
| Build a better NGL sour water stripping unit | Jan-03 | |||
| Improve NGL plant performance | Aug-01 | |||
| Espinosa, A. | ||||
| Use NIR technology to optimize plant operations | Feb-95 | |||
| Essam, Derek | ||||
| Valve signatures and partial stroke testing | Jan-03 | |||
| Estrada de Moraes, Guilherme Duque | ||||
| ACHEMA 2003 Perspective: Brazil | May-03 | |||
| Evans, Bruce | ||||
| New challenges confront ethylene furnace designers | Jun-04 | |||
| Evans, Dave | ||||
| Fieldbus Technology: Fieldbus improves petrochemical plant operation | May-99 | |||
| Ewan, Bruce C. R. | ||||
| Design considerations to prevent heat exchanger failure | Nov-99 | |||
| Ezernack, D. D. | ||||
| Minimize FCCU startup problems | Jun-97 | |||
| Back to Top | ||||