<%@ LANGUAGE=VBScript %> <% Option Explicit %> <% bConfidential = True iPublication = 24 %> Hydrocarbon Processing: 1994-Present Cumulative Index Subject-CON


cumulative index: 1994 – present


Author:  A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q-R | S | T | U-V | W | X-Y-Z

Subject:  A | B | C | D | E | F | G | H I | K | L | M | N | O | P | R | S | T | U | V | W
 
   Construction   Date
       
  A Hydrogen generation – a brief review
Project manager discuss vital design features
  Jul-01
 
A project manager's approach to quality management
For engineering/construction (E/C) companies, quality standards ensure a safe, operable plant that is free of rework requirements

Aug-94
 
A quality assurance program for refurbished process plants
This method provides necessary documentation to evaluate an entire facility before and after refurbishment, as well as assess future needs for modificat9ons, repairs and equipment purchase

Dec-95
 
ACHEMA '94 perspective: A view of ACHEMA '94 conference
A massive exhibit and numerous conference sessions address the petrochemical/chemical industry's current state and outlook
 
May-94
 
ACHEMA '94 perspective: Asian petrochemicals: what impact?
East Asia offers opportunities for both international and regional companies. Windows will open and close each country
 
May-94
 
ACHEMA '94 perspective: MTBE: its impact and promise
By 1995, the hydrocarbon processing industry will have constructed new facilities to produce more than 450,000 bpd of MTBE and other ethers
 
May-94
 
ACHEMA '94 perspective: The chemical industry, by country
 
May-94
 

Belgium

   
 

China

   
 

France

   
 

Germany

   
 

India

   
 

Italy

   
 

Japan

   
 

Korea

   
 

The Netherlands

   
 

United Kingdom

   
 

United States

   
 
ACHEMA '94 perspective: World polymers market outlook
The worse appears to be over for the plastics industry downturn. Stability and improved profits are ahead, but no '88–'89 'boom'
 
May-94
 
ACHEMA '97 Perspective: A view of ACHEMA '97 conference
The largest exhibit and industrial meeting addresses the present and future outlook for the petrochemical/chemical industry
 
May-97
 

Argentina

   
 

Belgium

   
 

Brazil

   
 

China

   
 

France

   
 

Germany

   
 

India

   
 

Italy

   
 

Japan

   
 

Korea

   
 

Mexico

   
 

Russia/The Former Soviet Union

   
 

Thailand

   
 

The Netherlands

   
 

United Kingdom

   
 

United States

   
 

Venezuela

   
 
ACHEMA 2000 perspective: A view of ACHEMA 2000
A massive exhibit and numerous conference sessions address the petrochemical/ chemical industry's current state and outlook
 
Mar-00
 
ACHEMA Perspective 2003
The authors (executives from the chemical trade associations and HPI consultants in 15 countries that produce most of the world’s petrochemicals) summarize their countries’ 2001 – 2002 petrochemical/chemical performance and provide outlooks for 2003.
 
May-03
 

Argentina

   
 

Belgium

   
 

Brazil

   
 

China

   
 

France

   
 

FSU (Russia)

   
 

Germany

   
 

Indonesia

   
 

Japan

   
 

Korea

   
 

Mexico

   
 

Saudi Arabia

   
 

United Kingdom

   
 

United States

   
 

Venezuela

   
 
AchemAsia ’95

Mar-95
 
Add depth to technical training
Use these 15 approaches and real-world examples to refresh the knowledge base and analytical skills of engineers and plant managers
 
Nov-03

Alliance contract sets standards for teamwork
This successful approach for a refinery revamp uses shared benefits and losses based on aggressive schedule, cost, quality and safety goals

Feb-00

Anatomy of a capacity increase, maintenance project for an ethylene unit
Revamp work is achieved both cost-effectively and safely

Jul-01
 
Are resources at the ready to build the future LNG industry?
Here are projections on likely market size and constraints facing the participants
 
Dec-05
 
Avoid distorted translations of technical terms
Knowing accurate English and Spanish usage diminishes risk of costly operational hazards
 
Dec-04
 
Avoid operating problems in air-cooled heat exchangers
Use these guidelines to troubleshoot and evaluate performance

Mar-97
 
Avoid pipe corrosion under insulation
Keys are proper selection, installation and maintenance
 
Apr-05
 
Avoid these mistakes when installing a flare flowmeter
New environmental regulations mandate reporting mass rates for hazardous compounds at flares. Apply these common sense guidelines and streamline meter selection
 
Jan-05
 
Benefits of pre-engineered modules
As petrochemical manufacturing and refining organizations become leaner, even mature technologies are candidates for vendor designed, engineered and fabricated systems
 
Dec-04
 
Better metallurgy for process equipment
Use these engineering and application data to aid selection

Jan-94
 
Blueprint for successful construction management
Systematic and disciplined way of working ensures vital project decisions are correct

May-99

Capital cost estimating
Use these guidelines to formulate more accurate projections

Oct-00
 
Case history: Converting an MTBE unit to isooctane operation
Due to the ban of blending MTBE into RFG, this company revamped its operation to produce another gasoline component using technology never proven on world-scale levels
 
Sep-03
 
Case history: Fawley FCCU olefins project
Careful planning enabled the delivery, construction and installation of a replacement 860-ton reactor within a 64-day turnaround
 
Feb-04

Centralized control room operates five process units
The 'stretch' thinking of project team members produced an innovative building in just one and a half years

Apr-02
 
Changing face of the engineering business, The
Reduce company overhead and produce quality products by applying new techniques for an effective engineering structure

Nov-99
 
China’s petrochemical industry: optimistic and expanding
Strong efforts will propel national enterprises into the global marketplace

Mar-98
 
Collect useful engineering performance data
When maintained accurately, past engineering records can be valuable tools for future project planning

Jun-96
 
Compact condensing: New technology improves on traditional approach
Benefits include higher efficiency and lower capital and installation costs
 
Jul-01
 
Consider a new contractor selection process for a shutdown alliance
This formalized quality evaluation can yield company-wide strategic benefits

Dec-98
 
Consider a technology resource group for successful project execution
Here's a strategy to compensate for corporate restructuring and the loss of a central engineering function

Dec-97
 
Consider an integrated execution methodology for your next project
Two major refiners used a new project approach for their Clean Fuels Projects that ensured a quality, and timely, startup while minimizing expenses
 
Sep-04
 
Consider comprehensive CPD efforts to cut costs
With performance real-time field data, designers can devise process retrofits at the conceptual stage that control project scope and minimize engineering revisions during FEED and detailed engineering
 
Jun-02
 
Consider precast polymer concrete pump foundations
Features include faster installation, improved corrosion resistance and lower vibration levels
 
Jul-01
 
Consider tubing solutions to enhance plant efficiency
It is more economical and less prone to leaks in many applications
 
Dec-03
 
Constructing and designing blast-resistant buildings
New technology improves safety and reliability for this critical plant structure
 
Nov-05
 
Cost estimating made simple
Avoid preparing detailed estimate costs using this alternative method

Sep-97
 
Currency turmoil strikes Asia-Pacific’s E&C firms
Although the long term looks encouraging, contractors must be vigilant if participating in this region

Mar-98
 
Delayed coking in the CIS
Deep-conversion technology will enable Russian refiners to compete in the global marketplace

Oct-98
 
Designing and maintaining plant piping and valve systems
Guidelines help develop safe, reliable layouts
 
Jul-97
 
Designing steam reformers for hydrogen production
Keep these important factors in mind when designing, revamping or troubleshooting

Jul-94
 
Developments in natural gas liquefaction
New technologies and design methods will play a large role in the design and construction of LNG projects
 
Apr-99
 
Document management throughout plant construction
Electronic system can improve design and communications between engineers, contractors and operators

Dec-98
 
E/Cs adopt matrix management
Properly structured and implemented, this system can assist in attaining business goals and objectives

Jun-96
 
E/Cs look upstream
The window of opportunity for downstream companies to enter the exploration and production market is closing

Mar-98
 
Effective new plant startup increases asset's net present value
An integrated work process reduces investment costs and mitigates potential risks
 
Jul-04
 
Enhance returns on processing plant investments
Working with an experienced contractor can uncover additional benefits when upgrading an existing unit
 
Jan-05
 
Evaluate risk and plan for the unforeseen
By understanding our liabilities, we can limit them and convert the future from enemy to opportunity
 
Feb-04
 
Evaluating effects of changes in process plant design
A thorough understanding of the engineering, procurement and construction sequences is vital to comprehensively quantify all potential schedule and cost impacts during the pricing, review and approval process
 
Dec-04
 
Examining EPC contracts
This overview highlights the risks and benefits of reimbursable vs. fixed-price agreements

May-99
 
Facilitate effective communications in a project environment
Proper planning provides a stable platform for success
 
Jul-03
 
Fieldbus Technology: Fieldbus improves petrochemical plant operation
Reduced design, installation and startup costs provided significant benefits
 
May-99
 
Fine-tune your delayed coker: obstacles and objectives
Practical guidelines assist debottlenecking coker operations to increase unit capacity and provide more processing flexibility
 
Sep-04
 
Floating-roof technology advances with lessons learned from an 80-year history
Consider these design fundamentals when selecting your storage solution
 
Sep-03
 
Follow four steps to ensure optimized process plant design
The right outside resource combines industry and application expertise, high-performance equipment, and engineering and fabrication know-how
 
Mar-04
 
Has quality management run out of steam?
Management leading a stable organization, having the most experienced and well-trained employees will probably provide the best quality product and service

Dec-96
 
How to achieve plant startups in developing countries
These contrast industrialized startups in areas such as availability of spare parts, manpower and working conditions

Apr-95
 
How to buy package equipment
Effective guidelines help project managers reduce costs and properly execute EPC assignments

Apr-99
 
How to renovate a 50-year-old wastewater treating plant, Part 1
Refinery project team uses value-based engineering, creative thinking and 'customer focus' to revamp a waste- and stormwater sewer system to meet Benzene NESHAP

Jan-96
 
How to renovate a 50-year-old wastewater treating plant, Part 2
Minimizing downtime required installing vapor-control equipment while the API sump was operating

Feb-96
 
How to select the proper subcontractor – Part I
Failure of subcontractors is a major issue: apply these effective guidelines for best results in overseas EPC projects
 
Jun-99
 
How to select the proper subcontractor – Part 2
Failure of subcontractors is a major issue: apply these concluding effective guidelines for selecting responsible subcontractors in overseas EPC projects

Jul-99
 
How VENNET improved a project
This unique, satellite-linked, online, real-time communication system ties together all parties in a major refinery construction effort in Venezuela

Dec-94
 
HPI Construction Boxscore
Published three times a year and used for years by engineers, contractors, and marketing personnel to identify active construction projects around the world for sales information, market research, and planning. Data includes project type, plant capacity, geographic area, operating company, engineering company, construction company, licensor.
   
 

HPI Construction Boxscore Update, February '94

Feb-94
 

HPI Construction Boxscore Update, June '94

  Jun-94
 

HPI Construction Boxscore, October '94
 

  Oct-94
 

HPI Construction Boxscore Update, February '95

Feb-95
 

HPI Construction Boxscore Update, June '95

  Jun-95
 

HPI Construction Boxscore, October '95
 

  Oct-95
 

HPI Construction Boxscore Update, February '96

Feb-96
 

HPI Construction Boxscore Update, June '96

  Jun-96
 

HPI Construction Boxscore, October '96
 

  Oct-96
 

HPI Construction Boxscore Update, February '97

Feb-97
 

HPI Construction Boxscore Update, June '97

  Jun-97
 

HPI Construction Boxscore, October '97
 

  Oct-97
 

HPI Construction Boxscore Update, February '98

  Feb-98
 

HPI Construction Boxscore Update, June '98

  Jun-98
 

HPI Construction Boxscore, October '98
 

  Oct-98
 

HPI Construction Boxscore Update, February '99

Feb-99
 

HPI Construction Boxscore Update, June '99

  Jun-99
 

HPI Construction Boxscore, October '99
 

  Oct-99

HPI Construction Boxscore Update, February '00

Feb-00
 

HPI Construction Boxscore Update, June '00

  Jun-00
 

HPI Construction Boxscore, October '00
 

  Oct-00

HPI Construction Boxscore Update, February '01

Feb-01
 

HPI Construction Boxscore Update, June '01

  Jun-01
 

HPI Construction Boxscore, October '01
 

  Oct-01
 

HPI Construction Boxscore Update, February '02

  Feb-02
 

HPI Construction Boxscore Update, June '02

  Jun-02
 

HPI Construction Boxscore, October '02
 

  Oct-02
 

HPI Construction Boxscore Update, February '03

  Feb-03
 

HPI Construction Boxscore Update, June '03

  Jun-03
 

HPI Construction Boxscore, October '03
 

  Oct-03
 

HPI Construction Boxscore Update, February '04

  Feb-04
 

HPI Construction Boxscore Update, June '04

  Jun-04
 

HPI Construction Boxscore, October '04
 

  Oct-04
 

HPI Construction Boxscore Update, February '05

  Feb-05
 

HPI Construction Boxscore Update, June '05

  Jun-05
 

HPI Construction Boxscore, October '05

Oct-05
 
Hydrocarbon value chain: now electricity
Compare process and power facilities’ cost and schedule during evaluation, front-end loading and execution phases

Nov-97

Hydrogen generation – a brief review, A
Project manager discuss vital design features

Jul-01

Implement a lessons learned process that works
An effective program facilitates fact-finding so that corrective actions can be applied throughout a project’s life cycle

Jan-00
 
Implementing NAFTA: one company’s success story
Here's how a joint-venture team jumped cultural and communication hurdles in record time

Sep-96
 
Improve client-contractor working relationships under PSM
Operators can use new guidelines to establish safety-compliance when hiring service providers

Oct-96
 
Improve CPVC piping reliability
Use these application and installation guidelines for better service
 
Jan-00
 
Improve crane safety
Prequalifying suppliers is an important step
 
Nov-03
 
Improve project decisions and teams
Companies that ignore the human dynamics in a project are set for a slow decline

Aug-96
 
Improve project implementation with CDP
Use this team approach concept for project management to increase work efficiency, avoid delays and reduce cost overruns

Dec-95

Improve startup of an olefins complex
The operations team performed early dryout of plant systems before mechanical completion of the entire plant, thus enabling a trouble-free commissioning of new equipment

Jun-00
 
Improve your database for cost estimation
Here’s a systematic approach for storing and retrieving valuable information
 
Jun-03

Improved planning can optimize solutions to produce clean fuel
Refiners may consider using alliances with contractors to shorten design and construction time for environmentally driven projects

Feb-01

Improved project definition ensures value-added performance – Part 1
Use these techniques to produce and manage a plan for successful execution

Aug-00

Improved project definition ensures value-added performance – Part 2
These key principles, tools and lessons learned provide managers the ammunition to fight cost and schedule escalations

Sep-00
 
Improved regasification methods reduce emissions
New technologies promote monetization of global LNG
 
Jul-05
 
Inherently safer design
Implementation challenges faced by new and existing facilities
 
Mar-03
 
Inherently safer design principles are proven in expansions
Operators mitigate processing risks when increasing unit capacity

Apr-97
 
Integrate HSE concepts in facility design
Incorporating these aspects early in the planning process significantly reduces rework and subsequent costs during construction and operation
 
Dec-07
 
Integrate workflow to execute projects quicker and at lowest cost
Here’s how to engineer to the job’s best interest, instead of the demands of the tools
 
Dec-02
 
International engineering alliances: risks and rewards
For the established EPC contractor, joint ventures and mergers are fast becoming necessary tools for global competitiveness

Jan-98
 
Is your plant inherently safer?
Managing process risk begins at the conceptual design stage

Jul-96
 
Is modularization right for your project?
One gasoil hydrotreater case history illustrates how $12.5 million was saved

Dec-07
 
It takes experience to be a construction contractor
Find out what it takes to successfully execute functions, fulfill responsibilities and solve problems to produce a safe and reliable project facility

Dec-95
 
Just-in-time engineering speeds design and construction
Methodology positively impacts the bottom line by minimizing front-end heat-tracing costs

May-99
 
Laser scanning solutions secure accurate dimensional data
This engineering and construction planning tool can reduce schedules, overall costs and exposure to potentially hazardous onsite environments
 
Dec-05
 
Lessons learned from relocation
As in the past, dismantling, relocating and refurbishing a used plant still provides economic incentives today

Dec-95

Lessons taught the teacher
Simulations can be effective in focusing attention on good – and bad – project management behaviors

Feb-00
 
Let's quit blaming the E/C's
Engineering/construction (E/C) companies – often accursed of being inefficient 'dinosaurs' – are getting a 'bum rap'

Dec-94
 
Leveraging a globalized work force
If managed with discipline, a workshare approach can yield significant benefits for all project stakeholders
 
Apr-04
 
LNG receiving and regasification terminal operations
Understanding and controlling boil-off gas pressure enhances energy efficiency