Farnand, S.
Hydrogen perspectives for 21st century refineries—Part 2
Petrochemicals
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Catalysts
/ Construction
/ Crude oil
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Middle East
/ Naphtha
/ Natural Gas
/ Octane
/ Utilities
H2 is the lifeblood of 21st century refineries. The application of various technological advancements and core developments has been raising the bar in the design, build, operations and maintenance of H2 facilities.
Hydrogen perspectives for 21st century refineries
Environment & Safety
/ Refining
/ Acid Gas Removal
/ Carbon Management
/ Crude oil
/ Diesel
/ Economics
/ Environment
/ Gasoline
/ Hydrogen
/ Safety
/ Treating
/ Utilities
As refining market trends continue to support increased demand for H2, its availability and cost are critical for many refiners, creating a tough environment for securing reliable, efficient and environmentally-friendly H2.
CO2 capture from SMRs: A demonstration project
Environment & Safety
/ Process Optimization
/ Refining
/ Americas
/ Carbon Management
/ Engineering & Design
/ Equipment
/ Hydrogen
/ Piping
Technical and economic results from this project will be key in determining the most effective path to commercialization.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction