Asgar-zadeh, S.
Saadat Asgar-zadeh is head of Integrated Refining and Feasibility Studies in the Institute of Petrochemical Processes. She has more than 45 yr of experience in refinery processes. Dr. Asgar-zadeh holds a doctorate in technical sciences and has authored more than 100 scientific papers. She was awarded a certificate of merit from the Azerbaijan National Academy of Science in 2011 and a progress medal in 2013.
Technical considerations for the Heydar Aliyev refinery revamp
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Refining
/ Acid Gas Removal
/ Europe
/ Construction
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Gasoline
/ Greenhouse Gases
/ Hydrotreating
/ Naphtha
/ Natural Gas
/ Products
/ Pumps
/ Reactors
/ Safety
/ Treating
The following case study describes the early development phases of SOCAR’s ongoing major revamp project at the Heydar Aliyev Refinery (HAR) in Baku, Azerbaijan, and its interface with the associated Azerikimya (AZK) steam cracking complex near Sumgait. References are made to the related SOCAR polymer project in Sumgayit, as well.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Brazil's Timbro to export 40% more sugar, enter ethanol market in 2024 4/24
- LG Chem denies report it will merge naphtha cracker business with Lotte Chemical 4/24
- Crude and gasoline stocks fell, distillate stocks rose last week, EIA says 4/24
- INERATEC secures state-of-the-art catalysts from Sasol for the production of sustainable e-fuels 4/24
- JX to join forces with Sumitomo at large scale SAF/BECCS project in Louisiana (U.S.) 4/24
- WestJet buys first Canadian-supplied SAF by Shell Aviation 4/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction