Fulmer, D.
David Fulmer is a technical development manager at Baker Hughes. He has 30 years of experience in field service, technical service, product management and product development in industrial water treatment. Past positions include account representative, technical consultant and water treatment product manager. Mr. Fulmer is a member of AIChE, and he has two patents pending and has authored three technical papers. He holds a BS degree in chemical engineering from Pennsylvania State University.
Non-phosphorus corrosion inhibitor optimizes cooling tower uptime for environmental compliance
Cooling water systems play a critical role in the efficient operation of hydrocarbon processing facilities.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- Neste enables Swedish airport and Västflyg airline to become the world's firsts to use SAF on all flights 6/8
- Valtek Valdisk High Performance Butterfly Valve, completes million-cycle test 6/8
- The sustainable aviation fuel entrepreneurs poised for takeoff 6/8
- India's May fuel consumption soars on robust manufacturing 6/8
- Kent awarded three-year multi-site Master Services Agreement with TotalEnergies 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction