Nava, J.
Optimize operating parameters of absorbers/strippers in gas plants
Gas Processing/LNG
/ Process Optimization
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Gas to liquids (GTL)
/ Heat Transfer
/ Middle East
/ Naphtha
Better recovery definition of C3s and C4s from gas absorber/stripper can lower costs
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Brazil's Timbro to export 40% more sugar, enter ethanol market in 2024 4/24
- LG Chem denies report it will merge naphtha cracker business with Lotte Chemical 4/24
- Crude and gasoline stocks fell, distillate stocks rose last week, EIA says 4/24
- INERATEC secures state-of-the-art catalysts from Sasol for the production of sustainable e-fuels 4/24
- JX to join forces with Sumitomo at large scale SAF/BECCS project in Louisiana (U.S.) 4/24
- WestJet buys first Canadian-supplied SAF by Shell Aviation 4/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction