Savoie, J.
Jason Savoie is the Executive Vice President of Burrow Global Automation (BGA), and has been involved in numerous MAC programs. He has more than 27 yr of experience in engineering project management, I/E design and automation.
Embracing MACs: A better way of executing automation projects
Historically, automation projects have been executed as single-transaction projects. Often, individual projects, along with phases within a given project, are bid with the potential for new vendors and different engineering teams.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction