Dixit, P.
Pramod Dixit works as a freelance consultant operating from Baroda, India. He provides informative lectures and training to engineers working in engineering, operations, inspection and maintenance groups of process plants and engineering companies. He has more than 44 yr of experience working at different positions in Indian companies, including Engineers India Ltd., L&T-Chiyoda Baroda, and ESSAR Offshore and Subsea Ltd. in greenfield and brownfield projects. He earned a BTech degree (mechanical) from IIT Roorkee India.
Project Management: Check installation of the tray column before box-up
To push the project schedule, plant owners sometimes proceed the boxing up of columns without approval of the tray designer.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- WestJet buys first Canadian-supplied SAF by Shell Aviation 4/23
- Technip Energies selected by Viridor to perform FEED on the Runcorn energy-from-waste carbon capture project in the UK 4/23
- SINOPEC completes its involvement in Kazakhstan's polyethylene project 4/23
- Neste premieres at Chinaplas: showcasing possibilities of bio-based and recycled materials for plastics 4/23
- Russia's oil refining near 11-month low 4/23
- Haiti fuel terminal operations halted as gangs seize trucks 4/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction