Wood, D. A.
What are the opportunities to construct liquefaction facilities at the Arctic Circle?
Building and operating natural gas plants in the high latitudes pose numerous challenges
Project execution risk management for addressing constructability
Use construction knowledge, experience and efficiency in a structured and systematic way throughout the design and execution planning stages
Better manage risks of gas-processing projects
All projects contain risks and opportunities; responding to these uncertainties requires a structured approach to risk management
North American natural gas market and infrastructure
The race is on to expand liquefied natural gas capacity to meet growing demand
Energy balances and climate change—hard choices for Asia
Oil and gas industries will play a pivotal role in carbon-emission reduction programs
Natural gas and LNG trade - a global perspective
New dynamics within the gas industry will accelerate its ability to eclipse oil as the premier fuel of the world economy
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- S-Oil's $7-B Shaheen petrochemical complex is on track for 1H 2026 start 2/17
- SBM Offshore awarded a study by Petrobras for FPSO CO2 carbon capture solution 2/17
- Drone strike hits Chevron, Exxon oil exports via Russia 2/17
- Marine fuel sales at top bunker hub Singapore log soft start to 2025 2/17
- Toyo-Malaysia secures OSBL project to support SAF production facility at Pengerang, Johor, Malaysia 2/14
- TOYO awarded licensing and equipment supply contract for the first ever urea fertilizer plant in Angola 2/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction