Ceary, P. J.
Philip Ceary graduated from the University of Maryland College Park with a BS degree in chemical engineering in May 2002. He works in the field of process design, optimization and logistics, and project development for ExxonMobil in Spring, Texas.
Coke drum and blowdown system overpressure protection design—Part 2
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Construction
/ Distillation
/ Drivers
/ Engineering & Design
/ Environment
/ Equipment
/ People
/ Products
/ Safety
/ Valves
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Argentina raises biofuel prices for domestic market 7/14
- Technip Energies' develops low-emission furnace design to reduce the carbon footprint of ethylene production 7/14
- Biofuel demand to soak up more than half of U.S. soyoil production next year, USDA says 7/14
- Russia's June seaborne oil product exports down 3.4% m/m 7/14
- Serbia seeks fifth U.S. sanctions waiver for Russian-owned oil firm NIS 7/14
- EIA: U.S. hydrocarbon production supported by export growth in long-term projections 7/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction