Moreno, Y.
Yiltzon Moreno is a Process Director in Fluor’s Amsterdam office. He has more than 23 yr of experience in oil and gas operations, front-end engineering and detailed design. He holds a BSc degree in chemical engineering from Zulia University (Venezuela) and a post-graduate specialization in refinery processes from Francisco de Miranda University (Venezuela).
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
- Middle East conflict could force up to 6 MMbpd crude run cuts across Asia 3/11
- America First Refining plans new Texas refinery, first in nearly 50 years 3/11
- GEA achieves further milestones with Pre2Fuel: Excellent performance in Bremfield's pretreatment plant in Malaysia 3/11
- AIRCO develops mobile fuel system to produce synthetic drop-in fuels from CO2 3/11
- Iraq asks KRG to help pipe crude oil to Turkey 3/11
- Ukraine's motor fuel to contain at least 7% bioethanol from July 3/11

