Moreno, Y.
Yiltzon Moreno is a Process Director in Fluor’s Amsterdam office. He has more than 23 yr of experience in oil and gas operations, front-end engineering and detailed design. He holds a BSc degree in chemical engineering from Zulia University (Venezuela) and a post-graduate specialization in refinery processes from Francisco de Miranda University (Venezuela).
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
- KBR's phenol technology selected by SABIC Fujian Petrochemicals 4/25
- Honeywell Technology helping to produce SAF with lower cost and waste 4/25
- Nigeria's NNPC partners local firm on new 100,000 bpd refinery 4/25
- Stranded cargo shows credit challenges at Nigeria's Dangote refinery 4/25
- Low U.S. distillate consumption reflects slow economic activity and biofuel substitution 4/25
- Clariant catalysts reduce customers’ footprints by 40 million tons of CO2e in 2023 4/25