Zurlo, J. A.
Jeffrey A. Zurlo is responsible for global marketing strategy–refining at GE Water & Process Technologies. With more than 25 years of experience in process engineering, refinery treatment sales and services, hydrocarbon product applications and technical support, he provides marketing and technical support to the refining and gas processing industries. Mr. Zurlo holds a BE degree in chemical engineering from the Stevens Institute of Technology in New Jersey.
Refining: High-impact challenges in today’s global refining market
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Crude oil
/ Environment
/ Equipment
/ Greenhouse Gases
/ Loss Prevention
/ Products
/ Safety
/ Sulfur
To stay competitive and thrive in today’s uncertain and volatile energy market that is characterized by major shifts in supply and demand dynamics, refiners must find ways to increase operational efficiencies, maximize productivity and produce refined products at lower costs.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. EPA to remove proposed EV volumes from biofuel blending rule 6/6
- BASF increases alkoxylates production capacity in Europe 6/6
- Russia's Sakhalin invites India and China to tap energy resources 6/6
- Airlines urge co-operation to help curb emissions 6/6
- Oil prices steady as economic fears offset Saudi output cut 6/6
- U.S. diesel demand is falling despite economic growth 6/6
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction