Whalen, J. K.
PE, is the chief engineer for John Crane. He is a member of STLE, ASME and the Vibration Institute. Mr. Whalen is also a member of the Turbomachinery Symposium Advisory Committee and is a registered professional engineer in the state of Texas. He holds a BS degree in mechanical engineering from the Rochester Institute of Technology. He worked for Dresser Rand, where he was involved in large turbine engineering and rotordynamics. Mr. Whalen joined Centritech Corp. in 1988 and helped form Turbo Components and Engineering in 1991.
Consider new labyrinth seals to optimize compressor operations
Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Compressors
/ Drivers
/ Engineering & Design
/ Equipment
/ Europe
/ Middle East
/ Motors
/ Rotating Equipment
/ Safety
Degradation of labyrinth seals in centrifugal impellers can have a significant impact on not only compressor power consumption but also on plant production rate. Upgrading to rub-tolerant seals can be..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Meridian Energy Group’s Davis Refinery Project in North Dakota (U.S.) will be the world’s first net-zero carbon refinery 4/17
- Lummus expands R&D capabilities to enhance innovation and water and wastewater technologies 4/17
- Niger plans to build diesel refinery and increase supplies to Mali 4/17
- BASF, SABIC, and Linde celebrate the start-up of the world's first large-scale electrically heated steam cracking furnace 4/17
- U.S. crude stocks rise, gasoline, distillate inventories fall 4/17
- Russia's offline primary oil refining capacity revised up for April 4/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction