Rahman, S.
Protect anion resin from biofouling
Good treatment practices can prevent this serious problem
Control microbial growth in your cooling water
Proper monitoring and chemical dosing can alleviate this challenge
Prevent adsorber bed failure
Improved operational integrity minimizes plant upsets and challenges
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Topsoe fuels China’s push for sustainable aviation fuel: Selected as technology provider for major project 1/23
- Europe set for record LNG imports in 2026 1/23
- Plug Power completes installation of 100-MW GenEco electrolyzer units at Galp’s Sines refinery 1/23
- Reju announces site selection for first U.S. industrial-sized facility regeneration hub 1/23
- Engineering a low-cost alternative catalyst for producing sustainable petrochemicals 1/23
- New report identifies methanol-to-jet as a key accelerator of the next wave of sustainable aviation fuel 1/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

