Conduct a design check for depressurization system for cold conditions
Emergency depressurization is a safety provision designed to release gas from a high-pressure system during emergency situations, such as a fire. An overview of cold depressurization is provided, including factors affecting the temperature profiles and critical factors considered while performing the study.
Design a staggered depressurization sequence for flare systems
Emergency depressurization is one of the most important design provisions for safeguarding facilities in case of an emergency. To overcome limitations of flare system capacity during such a scenario, depressurization can be practiced in a sequential manner. Presented here are the criteria and calculation methods for designing sequential depressurization, along with guidelines for the implementation of recommended designs.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Brazil's Timbro to export 40% more sugar, enter ethanol market in 2024 4/24
- LG Chem denies report it will merge naphtha cracker business with Lotte Chemical 4/24
- Crude and gasoline stocks fell, distillate stocks rose last week, EIA says 4/24
- INERATEC secures state-of-the-art catalysts from Sasol for the production of sustainable e-fuels 4/24
- JX to join forces with Sumitomo at large scale SAF/BECCS project in Louisiana (U.S.) 4/24
- WestJet buys first Canadian-supplied SAF by Shell Aviation 4/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction