Diba, C.
Ioan Cristian Diba is a Mechanical Engineer with Nuclear NDT. He is involved in the activities of the design and technical expertise engineering department, and specializes in boilers and pressure vessels.
Fatigue damage assessment of coke drums based on temperature monitoring
Coke drums are expensive equipment with a long manufacturing cycle, so a realistic and accurate life prediction can save significant time and money.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction