van Coller, G.
Gert van Coller graduated from the Department of Chemical Engineering at the University of Pretoria with a BS degree in chemical engineering. He completed his engineer in training course at Sasol in 2018 and now works as a process control engineer at the Solvent Units at Sasol’s Secunda Chemical Operations.
Implementation of averaging level control using native DCS functions
When applying averaging level control in a process plant, engineers can typically choose between proportional integral derivative (PID)-based control, such as p-only, gap and non-linear, or a model-based control like optimal averaging level control.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- China's March jet fuel exports jump 77.4% from a year earlier 4/18
- Nigeria strikes deal with Shell to supply $3.8-B methanol project 4/18
- Singapore fuel oil stockpiles rebound to 8-week high on higher imports 4/18
- Clariant launches new CATOFIN 312 propane dehydrogenation catalyst 4/18
- Solvay inaugurates new blowing agent production unit in Rosignano, Italy 4/18
- Meridian Energy Group’s Davis Refinery Project in North Dakota (U.S.) will be the world’s first net-zero carbon refinery 4/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction