Alharbi, W. A.
Wesam A. Alharbi has been working as a Vibration Engineer at Saudi Aramco’s Consulting Services Department since 2015. He provides technical consultations to resolve complex rotating machinery and static equipment vibration issues. His scope covers all Saudi Aramco oil and gas facilities in Saudi Arabia. Mr. Alharbi holds several international certifications in the field of condition monitoring and reliability and has a wide experience in technology evaluation and deployment of pilot programs.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Brazil's Timbro to export 40% more sugar, enter ethanol market in 2024 4/24
- LG Chem denies report it will merge naphtha cracker business with Lotte Chemical 4/24
- Crude and gasoline stocks fell, distillate stocks rose last week, EIA says 4/24
- INERATEC secures state-of-the-art catalysts from Sasol for the production of sustainable e-fuels 4/24
- JX to join forces with Sumitomo at large scale SAF/BECCS project in Louisiana (U.S.) 4/24
- WestJet buys first Canadian-supplied SAF by Shell Aviation 4/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction