Allah, W. K.
Wesam Khalaf Allah is a Saudi Aramco Engineer specialized in rotating equipment. He is currently a graduate mechanical engineering student at Texas A&M University.
Intensive study on damaged wear rings of centrifugal pumps—Part 2
This article is a continuation of Part 1, which discussed the evaluation of two damaged wear rings from centrifugal pump applications—a stationary (inner) ring and a rotating (outer) ring.
Intensive study on damaged wear rings of centrifugal pumps—Part 1
This article is based on damaged wear rings from centrifugal pump applications.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Azerbaijan's State Oil Company redirects supplies of jet fuel from STAR refinery to Turkish domestic market 5/8
- Hungry to sell, UAE slips hidden oil tankers through Strait of Hormuz 5/8
- Seven markets to track if peace breaks out in the Middle East 5/8
- Asia exports of refined fuels plunge amid Hormuz closure 5/8
- Libya's Zawiya oil refinery shut due to nearby clashes 5/8
- Meghna PVC partners with Jotun to manage corrosion maintenance 5/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

