Allah, W. K.
Wesam Khalaf Allah is a Saudi Aramco Engineer specialized in rotating equipment. He is currently a graduate mechanical engineering student at Texas A&M University.
Intensive study on damaged wear rings of centrifugal pumps—Part 2
This article is a continuation of Part 1, which discussed the evaluation of two damaged wear rings from centrifugal pump applications—a stationary (inner) ring and a rotating (outer) ring.
Intensive study on damaged wear rings of centrifugal pumps—Part 1
This article is based on damaged wear rings from centrifugal pump applications.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction