Donnelly, R.
Ruth Donnelly works for the materials and structural integrity department at The Welding Institute (TWI). Dr. Donnelly joined TWI in 2004, and has spent time working both as a project leader and as a teacher, preparing students to earn diplomas in welding engineering at the TWI training school. During this time, she spent nearly a decade in project management, including failure investigations, with a focus on ferritic steels.
An investigation into pressure vessel fatigue cracking caused by a tack weld
Pressure vessels and piping constitute the maximum percentage of static equipment in any oil and gas facility.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Renewable fuels project in Canada begins production 4/19
- Jet fuel demand growth lags as air traffic exceeds pre-pandemic level 4/19
- Jet2.com to use SAF at London Stansted Airport 4/19
- Neste and New Jersey Natural Gas target reducing greenhouse gas emissions with Neste MY Renewable Diesel 4/19
- Cepsa and Evos join up for green methanol storage in Spain and the Netherlands 4/19
- Russia's Bashneft oil company installs anti-drone nets to protect refineries 4/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction