Racette, Y.
Yves Racette is Principal Process Optimization Support Engineer at Valero Energy Corp. His areas of expertise are data historian systems and process unit monitoring.
Use advanced predictive analytics for early detection and warning of column flooding events
In this study, a methodology was implemented to predict crude distillation tower flooding events based on key process variables, including product yields, column pumparound (PA) flowrates, column temperatures and overhead reflux flowrate.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
- Emirates adds SAF on flights from Amsterdam Schiphol Airport 3/27
- Shipping industry faces fuel dilemma in bid to cut emissions 3/27
- Japan's Idemitsu, Mitsui Chemicals may consolidate ethylene plants in Chiba 3/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction