HP Construction: Asia Pacific
ABB completed delivering a distributed control system (DCS), safety system, and fire and gas system. The DCS was for the production process on a newly built floating production storage offshore (FPSO)..
ABB completed delivering a distributed control system (DCS), safety system, and fire and gas system. The DCS was for the production process on a newly built floating production storage offshore (FPSO) vessel for the China National Offshore Oil Co.
The supply scope consisted of an Advant control system, two safety systems, remote I/O and four operator stations. Customer training is also included in the contract.
Burckhardt Compression has an order with SECCO, a joint venture between BP and the Shanghai Petrochemical Co. The contract is for six labyrinth piston compressors for the Shanghai SECCO Petrochemical Complex, a polyolefins project, in China. The polyethylene process is provided by
Log in to view this article.
Not Yet A Subscriber? Here are Your Options.
1) Start a FREE TRIAL SUBSCRIPTION and gain access to all articles in the current issue of Hydrocarbon Processing magazine.
2) SUBSCRIBE to Hydrocarbon Processing magazine in print or digital format and gain ACCESS to the current issue as well as to 3 articles from the HP archives per month. $409 for an annual subscription*.
3) Start a FULL ACCESS PLAN SUBSCRIPTION and regain ACCESS to this article, the current issue, all past issues in the HP Archive, the HP Process Handbooks, HP Market Data, and more. $1,995 for an annual subscription. For information about group rates or multi-year terms, contact email Peter Ramsay or call +44 20 3409 2240*.
*Access will be granted the next business day.
From the Archive