Harismiadis, V. I., Hyperion Systems Engineering, Modeling and Simulation;
Stavrakas, D.,
Sood, A.,
Bhattad, G., Hyperion Systems Engineering;
Fantolini, A. M.,
Pedone, L.,
D’Orazi, L.,
Prodan, R., Saipem SpA
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
Sharma, S., Hunt Oil Co.;
Hill, D.,
Rano, P.,
Humphrey, G.,
Mayer, M., CB&I
The PERU LNG project includes a liquefaction plant, marine export facilities with an island breakwater, and a 408-km pipeline that connects to an existing pipeline in the Ayacucho mountains. Hunt Oil Co. is the operator.
As summer takes hold in the Northern Hemisphere, demand for energy in various forms increases. In looking back over the past 90 years, energy demand and pricing cycle through high and low points. In 2..
PCHEs boost power from waste heatHeatric recently supplied Echogen Power Systems Inc. with Printed Circuit Heat Exchangers (PCHEs) for Echogens Supercritical CO2 (ScCO2) power generation cycle. ..
The technologies needed to shape an industry transformation exist and have been proven on a large scale, the authors say.
1920s: THE FORMATION OF THE MODERN HPIDuring this period, a new industry was evolving focused on the refining of crude oil into fuels and other products. New demand for crude oil-based products, such ..
Vessel monitoring system uses thermal cameras Fig. 1. This vessel monitoring software shows the exact locations of imaging cameras. The Critical Vessel Monitoring System ..
Manipulating process plant parameters helps meet pipeline specifications
APC application yields significant operability, economic benefits
Today’s reality is that the US has enough natural gas to meet growing demand, allowing the country to focus on domestic uses and export possibilities.