Bae, S. H.
Sun Hyuk Bae is a Chief Researcher for SK Innovation. His background is in transport phenomena and reaction engineering. He has designed over 30 commercial and pilot reactors. Prior to joining SK Innovation, Dr. Bae was a senior researcher at LG Chemical. After joining SK Innovation, he was the leader of the computational engineering group from 2009–2016. Dr. Bae earned a BS degree in chemical engineering, along with his PhD, from the Korea Advanced Institute of Science and Technology (KAIST).
Stability evaluation of hot spots in the RDS process reactor
During the end-of-run (EOR) period of the authors’ company’s residue hydrodesulfurization (RDS) process in early February 2019, some hot spots occurred in the catalysts of the reactors.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. EPA to remove proposed EV volumes from biofuel blending rule 6/6
- BASF increases alkoxylates production capacity in Europe 6/6
- Russia's Sakhalin invites India and China to tap energy resources 6/6
- Airlines urge co-operation to help curb emissions 6/6
- Oil prices steady as economic fears offset Saudi output cut 6/6
- U.S. diesel demand is falling despite economic growth 6/6
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction