Fisher, P.
Monitor safety with improved risk performance indicators
Environment & Safety
/ Process Control
/ Information Systems
/ Loss Prevention
/ Management
/ Safety
Using Layer of Protection Analysis (LOPA) and real-time operational data, statistical estimates of the frequencies of future hazardous events can be generated. Combined with a qualitative estimate of the severity of hazardous events and the tolerable frequency determined in the LOPA, an objective leading metric of hazardous events can be created.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OMV receives €450-MM loan from the European Investment Bank for its 140-MW green hydrogen production facility 7/13
- Poland's Unimot says it will supply crude to Germany's Schwedt refinery 7/13
- Hormuz traffic slows to two-month low as renewed U.S., Iran strikes raise safety risk 7/13
- Sinopec deepens aviation fuel push with CNAF restructuring 7/13
- Indian naphtha premiums surge as Gulf, Russian supply tightens 7/13
- Less than a month's supply: Europe's jet fuel stocks are wafer thin as Iran tensions flare 7/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

