Sarwat, A
Adnan Sarwat has more than 25 yr of project and maintenance/turnaround experience in both the downstream and upstream sectors while mainly working in the Middle East with international oil companies. As a mechanical engineer, he has a passion for using his practical experience to train and mentor fellow and young engineers.
Arranging lines in a pipe rack: How to standardize pipe spacing in the oil and gas industry
This article provides deep insight to piping layout engineers, presenting a holistic/systematic approach for pipe spacing based on different pipe supports—e.g., rest, guide, shoe and clamps (rather than assuming spacing based on 50-mm or 75-mm clearance between pipes).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Supporting the shipping sector’s decarbonization to a carbon-free future 5/20
- Repsol: Renewable fuels are key to the transformation of the refining industry 5/20
- Pemex is delivering only a fraction of feedstock to new Olmeca refinery 5/20
- Gulfstream LNG export terminal (U.S.) receives U.S. FERC approval 5/20
- China's April gasoline exports fall to lowest level since July 2015 on recovering domestic demand 5/20
- Mammoet successfully transports/installs record-breaking hydrocracker for ORLEN Lietuva refinery 5/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction