Guesneux, S.
Use real-time optimization for low-sulfur gasoline production
As the main sulfur source in the gasoline pool, fluid catalytic cracker (FCC) gasoline cuts must undergo severe hydrodesulfurization (HDS) processing to achieve ultra-low-sulfur gasoline (ULSG) pool s..
Increase MTBE plant productivity
Applying advanced process control solutions enabled raising unit output without a major retrofit of existing equipment
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Discovering Honeywell's pathways to sustainability: Highlights from Global Sustainability Week 9/27
- bp's Peacock Project secures exclusive power deal with ExxonMobil-SABIC JV for sustainable materials production 9/27
- Shipping industry lacks clarity on future clean fuels on path towards decarbonization 9/27
- Neste expands its renewable fuels supply capabilities in Southern California (U.S.) 9/27
- Técnicas Reunidas and Sinopec Engineering Group sign a Strategic Alliance Cooperation Agreement 9/27
- How serious is Russia's fuel export ban and who will be hit? 9/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction