Alberini, S.
Stefano Alberini ia a Welding Engineer at Belleli Energy CPE Srl and has 10 yr of experience as a certified welding engineer. He received his MS degree in mechanical engineering from Bologna University in Italy in 2003, and has been certified as an International Welding Engineer (IWE) by the Italian Institute of Welding since 2006.
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. firms to develop Syria energy masterplan after Trump lifts sanctions 7/18
- Russian seaborne diesel exports for July 1–15 fall 6% month-on-month 7/18
- INEOS invests £30 MM to slash emissions at Hull site by 75% 7/18
- Mitsubishi Chemical Group invests in Licella Holdings, oil conversion technology using supercritical water 7/18
- BASF and Equinor sign 10-yr natural gas supply agreement 7/18
- Oil prices rise after new EU sanctions on Russia 7/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction