Mena, A.
Apolo Mena is a Production Engineer for bp. He works as a Production Engineer in the conversion area of the Castellón refinery. His career began in 2001 as a Field Operator, and he became a Conversion Supervisor 8 yr later. From 2019–2022, Mena was a Shift Superintendent.
Defossilizing the FCCU via co-processing of biogenic feedstock: From laboratory to commercial scale
Environment & Safety
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Process Optimization
/ Products
/ Reactors
/ Treating
/ Europe
Oil demand is expected to reach record highs this year1 after a sharp rebound following the COVID-19 pandemic.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. firms to develop Syria energy masterplan after Trump lifts sanctions 7/18
- Russian seaborne diesel exports for July 1–15 fall 6% month-on-month 7/18
- INEOS invests £30 MM to slash emissions at Hull site by 75% 7/18
- Mitsubishi Chemical Group invests in Licella Holdings, oil conversion technology using supercritical water 7/18
- BASF and Equinor sign 10-yr natural gas supply agreement 7/18
- Oil prices rise after new EU sanctions on Russia 7/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction