Walker, B. A.
Facility siting—balancing risk vs. cost
Companies should take a second look at identifying and analyzing hazards associated with temporary buildings
Optimum console design promotes control room efficiency
New features can enhance traditional functionality, reduce operating costs and foster worker safety
Challenges in control room design
Use these guidelines to reduce shiftwork fatigue and increase operator awareness+
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Equinor selects Aker for Mongstad refinery upgrade project 5/1
- Australian researchers testing SAF production from landfill gases 5/1
- Topsoe awarded contract to support FEED study for new low-carbon ammonia plant in Louisiana (U.S.) 5/1
- ClearSign Technologies receives burner contract for California (U.S.) refinery 5/1
- Sinopec's $4.5-B refinery in Sri Lanka to challenge India's fuel export market share 4/30
- Topsoe secures first SAF project in China 4/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction