Sami, M.
M. SAMI is a Process Engineer working at petrochemical plants in the UAE, as well as a Process Consultant at Cabo Fuels in Las Torres, Mexico.
Optimize operating parameters for C3 splitters to accommodate feed changes
In the oil and gas sector, fractionation is a vital part of every plant.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Blue Water significantly reduces CO2 emissions by switching to HVO in port operations 7/16
- Swire Shipping launches new carbon insetting program – ‘Voyage to Zero’ 7/16
- PyroGenesis announces completion of coke-oven gas valorization and H2 production project for Tata Steel 7/15
- New protein-based system enables plastic recycling with reusable enzymes 7/15
- CF Industries starts Donaldsonville (U.S.) Complex CO2 dehydration and compression unit, permanent CO2 sequestration 7/15
- Emerson introduces GenAI-enabled automation for power and water industries 7/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction