Pendergrass, J.
John Pendergrass is a Senior Engineer at CPFD LLC with 26 yr of experience applying simulations to multiphase processes. He has worked in the petrochemical industry with both engineering/design and simulation services companies. Over the past 6 yr, he has executed multiple full-scale simulation projects for FCCUs.
Viva Energy’s Geelong refinery reduces FCCU turnaround risk
Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Refining
/ Catalysts
/ Loss Prevention
/ Management
/ Safety
Change involves risk. Many fluidized catalytic cracking units (FCCUs) can be operated more profitably, but changes to achieve more efficient operations can be risky.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Argentina raises biofuel prices for domestic market 7/14
- Technip Energies' develops low-emission furnace design to reduce the carbon footprint of ethylene production 7/14
- Biofuel demand to soak up more than half of U.S. soyoil production next year, USDA says 7/14
- Russia's June seaborne oil product exports down 3.4% m/m 7/14
- Serbia seeks fifth U.S. sanctions waiver for Russian-owned oil firm NIS 7/14
- EIA: U.S. hydrocarbon production supported by export growth in long-term projections 7/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction