Martin, G.
Gary R. Martin is Business Development Manager of Refining Technologies with GTC Technology US LLC. He has been involved in revamps, including conceptual process design and process design packages for large capital revamps, optimization and troubleshooting services to the refining industry worldwide. He previously was President of Process Consulting Services Inc. and worked for Total Petroleum, El Paso Refining and Glitsch Inc. He holds a BS degree in chemical engineering from Oklahoma State University.
Heavy crude oil processing design and reliability
Maintenance & Reliability
/ Acid Gas Removal
/ Corrosion
/ Crude oil
/ Desulfurization
/ Engineering & Design
/ Environment
/ Equipment
/ Hydrogen
/ Process Optimization
/ Piping
/ Refining
/ Reactors
/ Safety
/ Treating
/ Sulfur
Revamping refineries to process heavier crude slates goes well beyond the requirements to meet equipment performance dictated by a shift in the quantity of lighter product yields to heavier products.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- U.S. West Coast refinery demand for hydrogen increasingly met by merchant suppliers 5/7
- BASF invests in capacity expansion of Basoflux® range of paraffin inhibitors in Spain 5/7
- Shell in talks to sell Malaysia fuel stations to Saudi Aramco 5/7
- India's fuel demand increases more than 6% y-o-y 5/7
- Asian refiners eye output cuts due to diesel surplus 5/7
- Kazakh refinery to export gasoline made from Russian oil 5/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction