Tsang, R.
Raymond Tsang is the Process Engineering Manager at Koch-Glitsch, UK. He has more than 30 yr of experience in the design of fractionation equipment. Mr. Tsang earned a BS degree in chemical engineering from the University of Newcastle upon Tyne in the UK.
Good distributor design for high-velocity feed debottlenecks a crude preflash tower
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Construction
/ Crude oil
/ Distillation
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Naphtha
/ Piping
/ Pumps
/ Europe
Bazan Group’s crude unit No. 3—not designed by any of the authors’ companies—was bottlenecked by the preflash tower.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Brazilian sugarcane processors mulling switch to more ethanol production 5/19
- Fuji Oil cancels Japanese biofuels plant due to high construction costs 5/19
- Italy's Meloni warns EU green policies risk 'industrial desertification' 5/19
- Nuberg EPC, EDL sign technical collaboration agreement across several industries 5/19
- Asian petrochemical producers chase ethane gains as margins dwindle 5/19
- U.S. order allows Puerto Rico to shore up ailing power grid with fuel oil plants 5/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction