Jensen, D. R.
Daryl Jensen joined OGT as a Development Engineer in 2021. He spent the previous 15 yr with Ortloff Engineers (now, Honeywell UOP), during which his responsibilities included process design/development, simulation, basic engineering design pack-age project execution, process control design, and onsite startup/troubleshooting for gas processing and treating technologies, including sulfur recovery (refinery and gas plant), cryogenic NGL/LPG recovery, acid gas treating and sour water stripping. Jensen holds BS and MS degrees in electrical engineering from New Mexico State University and is a registered Professional Engineer in Texas.
Riding the dragon: Sulfur plant thermal reactor temperature measurement
Of all the fundamental measured process variables, temperature is perhaps the most reliable.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- MOL inaugurated its €1.3-B, 200,000-tpy polyol complex in Tiszaújváros, Hungary 5/15
- ExxonMobil completes annual maintenance at Joliet (U.S.) refinery 5/15
- China's CNCEC to build 300,000-bpd Al-Faw refinery in Iraq 5/15
- Itochu to buy green ammonia from HIVE's $5.9-B Coega facility 5/15
- Higher refinery costs could increase summer gasoline prices says US EIA 5/15
- Nextchem completes acquisition of GasConTec, adding new low-carbon hydrogen/methanol to portfolio 5/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction